Service overview

Casework built for how a treatment room is actually used

Stock cabinets are built for kitchens. A treatment room asks for something else: a sink run that drains where the plumbing already sits, drawers deep enough for instrument cassettes, a countertop that survives disinfection several times a day, and a utility cutout in exactly the spot your chair needs it. We build to those constraints rather than working around them afterwards.

Every run is measured in the room itself once the walls are closed, drawn for your approval, then cut, finished and delivered as complete units. Because the same team holds the construction schedule, cabinets arrive the week the room is ready for them instead of three weeks after.

How we work

From field measurement to final install

The real millwork sequence, in order. Nothing is cut until you have signed the shop drawings.

01.Field measurement
Once walls are closed
02.Shop drawings
You sign before we cut
03.Cutting and joinery
Carcasses and drawers
04.Finishing and hardware
Edges, faces, runners
05.Delivery and install
Scribed to your walls

What we build and install

Commercial grade casework for every room in the practice, fabricated to your drawings and installed by the crew already working your job. No separate millwork contract to chase, and no second trade blaming the first when a cutout lands in the wrong place.

  • Treatment room runs
  • Sterilization stations
  • Reception and check in desks
  • Staff work stations
  • Upper and lower cabinets
  • Solid surface countertops
  • Instrument drawer systems
  • Utility and equipment cutouts
  • Laminate and wood veneer
  • Soft close hardware
  • Lab and utility casework
  • Delivery and installation

Common questions

What owners ask about cabinetry

01

  Why not just buy stock dental cabinets?

Sometimes you should, and we will say so. Stock units make sense when the room is a simple rectangle and the budget is tight. They stop making sense the moment a wall is out of square, a window sits where an upper cabinet needs to go, or your chair puts its utilities somewhere the catalogue never anticipated. Custom work costs more up front and avoids the filler panels and dead corners you would otherwise live with for fifteen years.

02

  How long does cabinetry take?

03

  What materials do you use?

04

  Can you match cabinetry in an existing practice?

05

  Who coordinates the plumbing and power behind the cabinets?
Planning a practice in the DMV region?
Speak with our team about design, permits, construction or project management.